Drilling Contract with UTE ACS COBRA CASTOR for "HAKURYU-10"

The Company's Official Page
http://www.jdc.co.jp/news/en/2009/drilling-contract-with-cobra-f-1.html
Back To Previous Page

Drilling Contract with UTE ACS COBRA CASTOR for "HAKURYU-10"

2009-07-28

JDC signed a drilling contract with UTE ACS COBRA CASTOR on July 28th for the jack-up rig "HAKURYU-10". The contract is for Firm 12 wells + 1 re-entry and Optional 2 wells to be drilled offshore Spain. The drilling operations are scheduled to start next summer.

Latest News: Mining

    この内容でのリリース掲載はまだ無いか、集計されておりません。

    この内容でのリリース掲載はまだ無いか、集計されておりません。

Most Popular: Mining

1. The Joint Study Agreement on the Block J...
INPEX CORPORATION 2009/04/06

Latest News: Japan Drilling Co., Ltd.


Most Popular: Japan Drilling Co., Ltd.

1. Establishment of a Subsidiary in the Net...
2010/03/02

Categories

Go to Page Top

View: Smartphone | PC

Language: English | Japanese

Home

Terms & Conditions

TwitterFacebook

About Us